Double Bar Kit Installation

Download PDF

Double Bar Kit Installation Instructions

  1. Install small Black insulator onto the center double bar bracket.
  2. Install the center double bar bracket onto the bottom of the center
    insulator arm. Use the Large vertical hole on the front (Crop side) of the
    insulator arm.
  3. Install the large insulators with the Black Shear Rings pointed to the tractor.
  4. Install the outer 2 remaining double bar brackets and their Large insulators.
  5. Install the 2 braided straps as shown in photo
  6. Route the Red HV cable through the Mounting bracket on the top of the 4″ X
    4″ square tube. It is located beside the center pocket.
  7. Route the HV cable across the top of the center insulator arm as shown in.
    Photo
  8. Install the copper electrodes. See Manual
  9. Connect the HV cable and the Braided cable to the Middle Copper
    electrode as shown. Use the copper plated clamps that were provided.
  10. Connect the opposite end of the braided cable to the small black insulator.
  11. Connect the opposite end of the front braided cable to the front copper
    electrode.

Subscribe to our newsletter

Join to receive new updates, articles, and resources
Subscription Form
© Copyright 2024 Old School Manufacturing
chevron-down
en_USEnglish
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram